(416) 820-3775

ARU registration for an existing unit in Halton Hills

Registration is what turns an existing suite into a legal one.

Under By-law 2023-0060 the owner applies to the Town with the registration form, drawings and fee. Inspectors check the unit against the codes and by-laws, and once all required inspections pass, it is entered on the public registry. It is one route within legalizing a basement apartment.

Call (416) 820-3775 Send the details

What do you submit?

  • The ARU registration application.
  • Owner's authorization if you are not the applicant.
  • A site plan with parking, entrances and window wells.
  • Floor plans with ceiling heights, rooms, windows, fire separations and alarms.
  • The registration fee from the Town's user fee schedule.

Who inspects?

Municipal law enforcement officers check property standards and zoning. Building inspectors check Building Code compliance for units created after July 14, 1994. Fire inspectors check the Fire Code for units that existed before then. The Town's web page also says these units are inspected by the Electrical Safety Authority.

What if something fails?

You are asked to make changes. A building permit, charged separately from registration, may be needed for the upgrades and for work already done without one. Those permit inspections have to pass before the unit is registered.

What happens after registration?

The unit appears on the Town's public registry and the owner receives confirmation. The Fire Department may inspect again from time to time, and a registration can be revoked if the unit stops meeting the requirements.

How long do you have?

The by-law lets the Registrar treat an application as abandoned if the requirements are not fulfilled within four months of receiving it, and refuse it where fixes found at inspection have not been seriously pursued. Line up the drawings, trades and access to the unit before you file.

Common questions

Can my agent apply?

Yes, with the owner's written authorization.

Is the fee refunded if I withdraw?

In part. The by-law returns 75 percent if only administration was done and 35 percent once inspections have taken place.

Do I register a new unit separately?

No. For a newly built unit, registration is part of the building permit process.

Related pages

Pre-1994 Units

An old suite is not automatically a legal one.

Violation Notice

An officer has been, or a letter has arrived, and the suite is not registered.

Check your basement before you build

(416) 820-3775

Have these ready:

  • Age and type of house
  • Ceiling height, including under ducts
  • Any door from the basement to outside
  • How many cars the driveway holds

Tell us about the basement

Used to answer your enquiry. Privacy.

Call (416) 820-3775