Basement apartment building permit in Halton Hills

The permit and the registration travel together for a new unit.

To create a new unit in an existing house, the owner applies to Building Services for a building permit and files the ARU registration application with it. Inspectors check the work at set stages. When everything passes, the occupancy permit is issued and the unit goes on the public registry. See also drawings and permits.

Call (416) 820-3775 Send the details

What goes into the application?

  • The building permit application with the Schedule 1 designer form.
  • The ARU registration application.
  • An owner's authorization if someone applies for you.
  • The drawing set and supporting calculations.
  • The permit and registration fees, paid when you apply.

What is inspected?

A municipal law enforcement officer carries out a pre-registration inspection against parts of the property standards and zoning by-laws. Building inspectors then check the mandatory construction stages. Do not cover framing, plumbing or insulation until the inspection for that stage has passed.

Which part of the code applies?

It depends on the age of the house. A unit added to a house more than five years old may use the compliance alternatives in Part 11 of the Building Code, which are less strict in places. A newer house follows Part 9.

Who do you ask at the Town?

The Building Services Division handles permits and registration: 905-873-2600 ext. 2925, or building@haltonhills.ca. Education development charges may also apply to a new unit, so ask about charges when you apply.

When is the unit ready to rent?

Not when the paint dries. Wait until the required inspections have passed, the occupancy permit for the unit is issued and the Town has sent confirmation that it is registered. Plan any move-in date around that, not around the end of construction.

Common questions

How long does review take?

The Town material we read does not promise a time. Ask Building Services what it is running when you apply.

Who applies, me or the contractor?

The registered owner, or someone the owner authorizes in writing.

Is electrical covered by the building permit?

No. Electrical work needs its own permit from the Electrical Safety Authority.

Related pages

Zoning & Parking Check

Find out whether your lot can take a unit before you pay to design one.

Basement Drawings

A thin drawing set is a common reason an application stalls.

Check your basement before you build

(416) 820-3775

Have these ready:

  • Age and type of house
  • Ceiling height, including under ducts
  • Any door from the basement to outside
  • How many cars the driveway holds

Tell us about the basement

Used to answer your enquiry. Privacy.

Call (416) 820-3775