Zoning and parking check for a Georgetown basement unit
Find out whether your lot can take a unit before you pay to design one.
Check three things: that your zone permits an additional unit, that there is room to park two cars for the house plus one for each unit, and how the house is serviced for sewage. This is the first stage of our drawings and permits work and the cheapest place to find a problem.
How many units are allowed?
The Town permits up to two additional residential units on a lot: both inside the house, or one inside and one in a detached building. Where a unit sits entirely in the basement, it may take the whole basement floor area.
How much parking is needed?
- Two spaces for the main home.
- One more for each additional unit.
- A driveway space at least 2.75 by 5.5 metres.
- Driveway no wider than 7.0 metres, with 40 percent of the front yard kept as soft landscaping.
Where the zoning rules cannot be met, a minor variance can be requested from the Committee of Adjustment. A variance is a decision the committee makes, not a formality.
What if the house is on a septic system?
A septic assessment by a qualified person has to go in with the permit application. It confirms the system can handle the extra unit. If it cannot, the system work needs its own permit first.
Are there exceptions by location?
Properties inside the Niagara Escarpment Plan Area are not under the same zoning by-law, and parts of Halton Hills fall inside it. Confirm your address on the Town's zoning map, or ask the Town's zoning officer at 905-873-2600 ext. 2034.
Common questions
Does a garage space count?
A garage space can count if it is big enough. The Town lists 2.9 by 6.0 metres for a single garage space.
Is there a minimum lot width?
The Town's page says there is no longer a minimum lot frontage rule for additional units. Parking and zone standards still apply.
Can a townhouse have one?
The registration by-law covers detached houses, semi-detached houses and townhouses. Parking is often the hard part for a townhouse.
Related pages
Basement Drawings
A thin drawing set is a common reason an application stalls.
Building Permit
The permit and the registration travel together for a new unit.
Check your basement before you build
Have these ready:
- Age and type of house
- Ceiling height, including under ducts
- Any door from the basement to outside
- How many cars the driveway holds