A new basement unit in an existing house needs a building permit from the Town of Halton Hills, and the registration application goes in with it. Before that, the lot has to be checked and the house drawn as it is and as it will be. Getting this order right avoids rebuilding finished work.

Call (416) 820-3775 Send the details

Which step comes first?

Zoning and parking. If the lot cannot take a unit, drawings are wasted money. Start with a zoning and parking check.

What has to be drawn?

A site plan, the existing floors, the proposed unit, elevations and construction sections, plus information on heating and the water service. Our page on basement apartment drawings lists what the Town asks to see.

How does the permit run?

The application is submitted online, fees are paid at that time, the Town reviews it, and inspections follow the work. The building permit page walks through it through to the registry.

Who can prepare the drawings?

The Town's guide says a property owner may prepare them where no more than one additional unit is proposed. Where two units are proposed inside the house, a designer registered with the Ministry of Municipal Affairs and Housing with the Small Buildings qualification is needed.

Preparing your own is allowed for one unit; it is still a technical set, and missing items hold up the application.

Drawings & Permits: more detail

Zoning & Parking Check

Find out whether your lot can take a unit before you pay to design one.

Basement Drawings

A thin drawing set is a common reason an application stalls.

Building Permit

The permit and the registration travel together for a new unit.

Common questions

Can I start work while the permit is in review?

Wait for the permit. Work done without one may have to be opened up for inspection or changed.

Is there a fee to the Town?

Yes. Building permit and registration fees are set in the Town's user fee schedule and are separate from any design or construction cost.

I already finished my basement. Do I still need drawings?

Yes, if it will be a separate unit. Registration asks for floor plans and a site plan even for work that is already there.

Check your basement before you build

(416) 820-3775

Have these ready:

  • Age and type of house
  • Ceiling height, including under ducts
  • Any door from the basement to outside
  • How many cars the driveway holds

Tell us about the basement

Used to answer your enquiry. Privacy.

Call (416) 820-3775