Basement apartment drawings for a Halton Hills permit
A thin drawing set is a common reason an application stalls.
The Town wants to see the lot, every floor as it stands, the proposed unit, and how fire, air, water and exits are handled. Measured drawings also show early whether the ceiling, windows and stairs will pass. They are the core of our drawings and permits service.
What goes on the site plan?
- Lot shape, house position and setbacks.
- Other buildings, and the septic system if there is one.
- Parking spaces, including one unobstructed space for each unit.
- Entrances, walkout stairs, egress windows and window wells.
What goes on the floor plans?
Existing and proposed plans show room uses, sizes and areas, doors and windows, the furnace, stairs and common areas. The proposed plan adds ceiling heights in every room, including under bulkheads, plumbing fixtures, glass area calculations, fire separation notes and smoke and carbon monoxide alarm locations.
What else is attached?
- Elevations showing doors, windows and the unit entrance.
- Sections through walls, ceiling, fire separations and window wells.
- Heating and ventilation design, or the changes to the existing system.
- The water service size calculation.
- A septic assessment where it applies.
What should be measured before design starts?
Floor to joists, floor to the underside of every duct and beam, window openings and sill heights, stair width and headroom, and the location of the electrical panel, furnace and drains. Those numbers decide the layout more than any floor plan idea does.
What do drawings often reveal?
A duct that drops below 1850 millimetres, a bedroom window too small to climb through, a stair with little headroom, or a furnace in the middle of the only route out. Each has a fix or a hard limit, and either one is cheaper to learn on paper than after framing.
Common questions
Can you use the builder's original plans?
They help as a starting point, but the Town needs the house as it is now. Measure it on site.
Do the drawings guarantee a permit?
No. The Town reviews every application and may ask for changes.
Do I need an engineer?
Sometimes, for structural changes such as a new foundation opening. The designer will say if one is needed.
Related pages
Zoning & Parking Check
Find out whether your lot can take a unit before you pay to design one.
Building Permit
The permit and the registration travel together for a new unit.
Check your basement before you build
Have these ready:
- Age and type of house
- Ceiling height, including under ducts
- Any door from the basement to outside
- How many cars the driveway holds